subject
Engineering, 01.04.2021 15:50 fantasticratz2

100 POINTS FOR THIS QUESTION, PLEASE HURRY


100 POINTS FOR THIS QUESTION, PLEASE HURRY
100 POINTS FOR THIS QUESTION, PLEASE HURRY

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 19:10
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
100 POINTS FOR THIS QUESTION, PLEASE HURRY

...
Questions
question
Mathematics, 25.08.2021 04:30
question
Mathematics, 25.08.2021 04:30
Questions on the website: 13722363