Engineering, 09.04.2021 14:00 ozzy1146

25 The following Information is available for a factory,
Daily working hours
8
Number of working days in week(s) 6
No of operators 20
Std. Hours per unit of production during a particular week 4
Number of units produced
48
Absentee man days
Idle time due to loadshedding
30 man darys
Find
i) Absenteeism percentage
ii) Labour utilisation percentage
iii) production efficiency of labour
iv) Overall productivity of labour in terms of units produced/week/
employee​

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
You know the right answer?
25 The following Information is available for a factory,
Daily working hours
8
Numbe...
Questions
question
History, 27.07.2019 00:30
question
Mathematics, 27.07.2019 00:30
question
Mathematics, 27.07.2019 00:30
Questions on the website: 13722359