subject
Engineering, 12.04.2021 09:50 HammondE

An Engineer is responsible for the disposal of “Hazardous Chemical Waste” and due to the high costs involved is asked by the CEO to arrange to have the materials dumped in the river that runs past the outer perimeter of the factory. a) Should he comply? Explain(3 marks)

b) Explain the unethical issues involved(3 marks)

c) Explain the consequences of disposing the chemicals in the river.(4 marks)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 06.07.2019 02:30
Define thermoplastic polymers and thermosetting polymers in terms of their structures, and (ii) describe briefly a process suitable for the production of products from each type of polymer.
Answers: 3
You know the right answer?
An Engineer is responsible for the disposal of “Hazardous Chemical Waste” and due to the high costs...
Questions
question
Mathematics, 09.12.2020 03:50
question
Mathematics, 09.12.2020 03:50
question
Mathematics, 09.12.2020 03:50
question
Mathematics, 09.12.2020 03:50
question
Mathematics, 09.12.2020 03:50
question
Mathematics, 09.12.2020 03:50
Questions on the website: 13722360