Engineering, 12.04.2021 21:40 izearaholland7308
A hydropower facility is being planned for construction 5 miles southwest of the town of Winnemucca, Nevada. The water surface of the Lahontan Reservoir will average 75 meters above the tailrace with a riveted steel penstock 300 meters long and a diameter of 1.7 meters. With an average water temperature of 20C, the flow rate provided by the penstock is to be 16m3/s with a combined head loss in the turbine, located slightly more than 3 meters above the tailrace, and draft tube of 2.0 meters and an average velocity in the tailrace of 0.5 m/s. Your role in the planning process is to determine the effective head that will be supplied to the turbine and the amount of power that can be extracted from the system.
Answers: 1
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
A hydropower facility is being planned for construction 5 miles southwest of the town of Winnemucca,...
Computers and Technology, 13.06.2021 21:10
English, 13.06.2021 21:10
Biology, 13.06.2021 21:10
Business, 13.06.2021 21:10
Mathematics, 13.06.2021 21:10
History, 13.06.2021 21:10
Mathematics, 13.06.2021 21:10
Social Studies, 13.06.2021 21:10
Social Studies, 13.06.2021 21:10
Arts, 13.06.2021 21:10
Chemistry, 13.06.2021 21:10