subject
Engineering, 14.04.2021 21:20 nickname0097

PLEASE I NEED HELP THIS IS IMPORTANT. Planning a Solution (Engineering Design Process)
Tuesday, April 13, 2021 8:42 PM
A solution is to construct a virtual (dangerous and dull) demining
excavation robot that locates, removes and detonates mines.
If BOMB SQUAD removed the landmines, then it would help to end
deforestation, soil degradation, and water pollution. The
environment can be usable again to grow natural resources. The
economy will improve because.
Some
countries affected by landmines areand.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
question
Engineering, 05.07.2019 04:30
Technician a says that in a worm gear steering system, most excessive steering free play is usually found in the gearbox. technician b says that in a rack-and-pinion steering system, excessive free play can be found in the bushings. who is correct?
Answers: 2
You know the right answer?
PLEASE I NEED HELP THIS IS IMPORTANT. Planning a Solution (Engineering Design Process)
Tuesda...
Questions
question
Mathematics, 12.10.2020 05:01
question
Mathematics, 12.10.2020 05:01
question
History, 12.10.2020 05:01
question
History, 12.10.2020 05:01
Questions on the website: 13722359