During the constructionof a house, six joists of 24 feet each must be trimmed to the cor-rect length of 23 feet. The operationsfor cutting a joist involve the following sequence: 1.~ Operation 1. Place joist on saw horses 2. Measure correct length (23 feet) 3. Mark cutting line for circular saw 4. Trim joist to correct length 5. Stack trimmedjoist in a designated area Time (seconds) 15 5 5 20 20 1.2 Three persons are involved: Two loaders must work simultaneously on operations 1,2, and 5, and one cutter handles operations 3 and 4. There are two pairs of saw horses on which untrimmedjoists are placed in preparationfor cutting, and each pair can hold up to three side-by-side joists. Suggest a good schedule for trimming the six joists.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
During the constructionof a house, six joists of 24 feet each must be trimmed to the cor-rect length...
Questions
question
Mathematics, 04.12.2020 17:40
question
Spanish, 04.12.2020 17:40
question
History, 04.12.2020 17:50
question
Mathematics, 04.12.2020 17:50
question
Mathematics, 04.12.2020 17:50
Questions on the website: 13722360