Part X requires machining on a milling machine (operations A and B are required). Find the number of machines required to
produce 3000 parts per week. Assume the company will be
operating 5 days per week, 18 hours per day. The following
information is known:
Ext. If the milling machine requires tool changes and
preventive maintenance after every lot of 500 parts.
These changes require 30 min.


Part X requires machining on a milling machine (operations A

and B are required). Find the number

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40ยฐc and pl = 1 .2 mpa. water vapor att2-200ยฐc and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
question
Engineering, 04.07.2019 19:20
Amass-spring-viscous damper system of mass 3 kg has a frequency of 100 rad/s and is critically damped. its initial conditions are x(0)-3 mm and (0)-2.3 m/s. does the system overshoot its equilibrium position? prove your answer
Answers: 1
You know the right answer?
Part X requires machining on a milling machine (operations A and B are required). Find the number...