Engineering, 25.04.2021 20:50 Aprilbtrippin2004
Your company has just brought a new 22-core processor, and you have been tasked with optimizing your software for this processor. You will run four applications on this system, but the resource requirements are not equal. Assume the system and application characteristics listed in table 1.1
Table 1.1 Four Applications
Application
A
B
C
D
% resources needed
41
27
18
14
% parallelizable
50
80
60
90
The percentage of resources of assuming they are all run in serial. Assume that when you parallelize a portion of the program by X, the speedup for that portion is X.
a. How much speedup would result from running application A on the entire 22-core processor, as compared to running it serially?
b. How much speedup would result from running application D on the entire 22-core processor, as compared to running it serially?
c. Given that application A requires 41% of the resources, if we statically assign it 41% of the cores, what is the overall speedup if A is run parallelized but everything else is run serially?
d. What is the overall speedup if all four applications are statically assigned some of the cores, relative to their percentage of resource needs, and all run parallelized?
Answers: 2
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26Β°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70Β°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
Your company has just brought a new 22-core processor, and you have been tasked with optimizing your...
World Languages, 19.09.2019 09:30
Social Studies, 19.09.2019 09:30
History, 19.09.2019 09:30
Arts, 19.09.2019 09:30
Biology, 19.09.2019 09:30
Mathematics, 19.09.2019 09:30
History, 19.09.2019 09:30