subject
Engineering, 03.05.2021 14:30 jennaranelli05

In a ground-water basin of 12 square miles, there are two aquifers: an upper unconfined aquifer 500 ft in thickness and a lower confined aquifer with an available hydraulic head drop of 150 ft. Hydraulic tests have determined that the specific yield of the upper unit is 0.12 and the storativity of the lower unit is 4x10-4. What is the amount of recoverable ground water in the basin

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90Ā° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
In a ground-water basin of 12 square miles, there are two aquifers: an upper unconfined aquifer 500...
Questions
question
French, 09.11.2020 23:20
question
Mathematics, 09.11.2020 23:20
question
Mathematics, 09.11.2020 23:20
question
Biology, 09.11.2020 23:20
question
Mathematics, 09.11.2020 23:20
question
Mathematics, 09.11.2020 23:20
question
Medicine, 09.11.2020 23:20
question
Mathematics, 09.11.2020 23:20
Questions on the website: 13722363