In the day ahead market for May 4th, 10-11 am: the clearing price is $28.75/MWh. In the real time market for May 4th, 10-11 am: the clearing price is $34.28/MWh. Suppose at May 4th, 10-11 am, the demand of City M is 34,900 MW and the wind power generation of ABC generation company is 5,000 MW, Note:
Tose electricity to the real time market, the price is (real time clearing price) 0.9
To purchase electricity from the real time market, the price is (real time clearing price) *1.1
Part A ) ABC generation company owns a natural gas power plant and wind power plant. The capacity of the natural gas power plant is 40,000MW. The cost of wind power generation is $4/MWh and the cost of natural gas generation is $15/MWh. ABC generation company provides ts bid at S25/MWh for both wind power 7,000MW and natural gas 33,000MW in the day-ahead market.
1. At what price will this generation company sell its energy?
2. How much amount of natural gas energy this generation company will provide on May 4th from 10:00am to 11:00am.
3. What is the total profit for this generation company?
Part B ) A utility company provides its bid at $30/MWh for purchasing 30,000MW in the day ahead market. It sells the energy to their customers at the flat rate 11.5 cents/ KWh. This utility company covers 90% of the demand in the city M
1. How much amount of energy this company needs to buy or sell in the real-time market?
2. What is the total profit for this utility company?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
10 kg of co2 is initially contained at 400 kpa and 300 k. the gas constant for carbon dioxide is 189 j/lkg k) and has a specific heat ratio, k, of 1.289. isentropic expansion then occurs until the pressure is 200 kpa. a) determine the initial volume of co2 in m. b) determine the final temperature in k. c) determine the work done by the system during the expansion kl.
Answers: 2
question
Engineering, 04.07.2019 19:20
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
You know the right answer?
In the day ahead market for May 4th, 10-11 am: the clearing price is $28.75/MWh. In the real time ma...
Questions
question
Mathematics, 14.12.2019 05:31
question
Social Studies, 14.12.2019 05:31
question
Mathematics, 14.12.2019 05:31
Questions on the website: 13722359