Multiple Choice You work for a large engineering design firm that receives a contract to build a new multi-level sports and fitness complex. It’s a lucrative contract, but the hitch is that the project must be completed on a tight time frame with no cost overruns. In this situation, which of the following might your company do to best advantage?

A. Assign a single team to the project and involve the contractors as part of the in-house team.

B. Do the design work in-house and then have the design team contract out the construction work to the lowest bidder, to be managed by a team the contractor assembles.

C. Assign separate teams to the design phase, choose the best design, and then contract out construction to the bidder that best balances low cost with high qualifications.

D. Do the design work in-house and then have the design team contract out the construction work to the bidder with the best qualifications, to be managed by a team the contractor assembles.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Multiple Choice You work for a large engineering design firm that receives a contract to build a ne...
Questions
question
Biology, 03.04.2020 04:40
question
Mathematics, 03.04.2020 04:43
question
Mathematics, 03.04.2020 04:43
Questions on the website: 13722361