subject
Engineering, 07.06.2021 14:00 rouchedavisin4

Two delivery methods have been proposed for a standard delivery method for new bridge constructions in Oregon to overcome traditional design-bid-build models that do not adequately account for site conditions and constructability, and often lead to additional expenses. One alternative must be selected to represent the delivery method specified in the RFP. Based on data from recent bridge construction projects of comparable size, we can estimate the savings from reduced redesign costs, risk management costs, and overhead costs during the life of the construction contract over the traditional delivery model. The estimated costs of a 18-month contract are the following: Alternative Construction manager /General contractor Design-Build Preconstruction and design costs $80,000 $90000 Monthly savings $4000 $6500 Project life, months 18 18 Which alternative should be selected based on the future worth method? Use a MARR of 4%, compounded monthly. Assume other benefits and costs are negligible.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15Β°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
Two delivery methods have been proposed for a standard delivery method for new bridge constructions...
Questions
question
Biology, 30.09.2019 01:30
Questions on the website: 13722361