subject
Engineering, 10.06.2021 19:10 jaimes04

9. A concrete dam (Fig below) is constructed across a river over a permeable stratum of soil of limited thickness. The water heads are upstream side 16m and 2 m on the downstream side. The flow net constructed under the dam gives is given as below. What is the value of Nf and Nd?
Calculate the seepage loss through the subsoil if the average value of the hydraulic conductivity is 6 x 10-3 cm/sec horizontally and 3 x 10-4 cm/ sec vertically.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
9. A concrete dam (Fig below) is constructed across a river over a permeable stratum of soil of limi...
Questions
question
Mathematics, 09.02.2021 19:40
question
Mathematics, 09.02.2021 19:40
Questions on the website: 13722363