subject
Engineering, 21.06.2021 18:20 kassidyopry15

You are in charge of a large assembly shop. One of your customers has promised to award you a large contract for the assembly of 1000 units of a new product. The suggested bid price is based on an average of 20 hours of direct labor per unit. You conduct a couple test assemblies and find that, the first unit took 50 hours and the second unit completed in just 45 hours. How many hours do you expect the assembly of the first hundred units and the second 100 units to take? Is the contractor’s assumption about the average labor hours per unit valid or should the price be revised?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
You are in charge of a large assembly shop. One of your customers has promised to award you a large...
Questions
question
Mathematics, 03.02.2020 00:48
Questions on the website: 13722367