Engineering, 30.06.2021 15:40 mosleykimberly944
Partially automated scanner that reads the piece-goods vouchers costs about 1308900 to make it operational. Operating costs are projected to be around 655,500 per year. The scanner is expected to last for five years. The scanners net salvage value is 130,000, according to estimates. The new automated system is estimated to save birr 1,700,500 in labour cost per year calculate - net cash flow over the life of the scanner - what is the time frame for recouping your investment - if the interest rate is 15% after taxes, what would be the discount pay back period?
Answers: 2
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
Partially automated scanner that reads the piece-goods vouchers costs about 1308900 to make it opera...
Social Studies, 12.07.2019 07:00
Mathematics, 12.07.2019 07:00
Mathematics, 12.07.2019 07:00
History, 12.07.2019 07:00
English, 12.07.2019 07:00
Mathematics, 12.07.2019 07:00
Mathematics, 12.07.2019 07:00
History, 12.07.2019 07:00
History, 12.07.2019 07:00
Mathematics, 12.07.2019 07:00