-The CNC Lathe is scheduled to run for an 8 hour shift. The normal shift includes total of 45 minute meal breaks. During the shift the Machine experiences 60 minutes of unscheduled downtime. The Planned Rate for the part being produced is 40 Units/Hour or 250 part per shift. The Machine produced 242 Total Units during the shift. The Good Units produced in that shift are 230 good units. Calculate the OEE. the subject is quality control

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:20
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
question
Engineering, 04.07.2019 19:20
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
question
Engineering, 06.07.2019 03:20
1kg of water contained in a piston-cylinder assembly undergoes two processes in series from an initial state where the pressure is 3.0 bar and the temperature is 150°c process 1-2: the water is compressed isothermally to a volume of 0.25 m^3 with 120 kj of work being done to the system. process 2-3: the water is heated at constant volume to a final pressure of 10 bar. a. find the change in internal energy for the system. b. calculate the amount of heat transferred, in kj. c. sketch both processes on a t-v diagram. (196.33 kj/kg, 76.33 kj)
Answers: 1
You know the right answer?
-The CNC Lathe is scheduled to run for an 8 hour shift. The normal shift includes total of 45 minute...
Questions
question
Mathematics, 24.05.2021 21:30
question
Mathematics, 24.05.2021 21:30
question
Mathematics, 24.05.2021 21:30
question
Business, 24.05.2021 21:30
question
Mathematics, 24.05.2021 21:30
question
Mathematics, 24.05.2021 21:30
question
English, 24.05.2021 21:30
question
Mathematics, 24.05.2021 21:30
Questions on the website: 13722361