Rafel knows that lessons learned is a valuable aid to future projects. When should he and his team address lessons learned on a project?
Select an
Add lessons learned as a topic in status meetings
Review past lessons learned so a new one does not have to be created,
Create lessons learned at the end of the project.
Brainstorm lessons learned at the beginning of a project

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 19:10
Estimate the change in specific internal energy au and specific enthalpy h from inlet to outlet for ethylene glycol (a liquid) flowing through each of the following devices: (a) a heat exchanger where the glycol temperature increases from 20 Ā°c to 80 Ā°c; (b) a pump operating at about 25 Ā°c and increasing the glycol pressure from 100 kpa to 8 mpa.
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Rafel knows that lessons learned is a valuable aid to future projects. When should he and his team a...
Questions
question
Social Studies, 09.06.2020 21:57
question
Mathematics, 09.06.2020 21:57
question
Mathematics, 09.06.2020 21:57
question
Mathematics, 09.06.2020 21:57
question
Biology, 09.06.2020 21:57
question
Biology, 09.06.2020 21:57
Questions on the website: 13722367