subject
Engineering, 04.08.2021 22:50 samantaisabel6015

A treatment plant is being designed for a city that requires an equalization basin to even out flow. The average daily flow is 0.400 m3/s. At certain time the hourly flow rate was 0.526 m3/s. Find the volume (m3) of water added/removed in the equalization basin during that period.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
question
Engineering, 04.07.2019 19:10
Plan an experiment to measure the surface tension of a liquid similar to water. if necessary, review the ncfmf video surface tension for ideas. which method would be most suitable for use in an undergraduate laboratory? what experimental precision could be expected?
Answers: 2
question
Engineering, 06.07.2019 03:10
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
You know the right answer?
A treatment plant is being designed for a city that requires an equalization basin to even out flow....
Questions
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:10
question
Arts, 26.01.2021 23:10
Questions on the website: 13722367