subject
Engineering, 10.08.2021 02:20 vrivers60

Aassembly line in a car assembly plant is scheduled to be available for 10.5 hours of production each day. The actual operating time each day has been found to be on average 8 hours after taking into consideration unplanned downtime incidents. Each day an average of 500 cars is produced by the assembly line, but due to the process capability of the equipment (on the assembly line) an average of 100 cars are found to be defective each day. The assembly line was designed to produce at a rate of 75 cars per hour when operational. Determine the following:
a. Availability Performance
b. Quality Overall Equipment
c. Effectiveness

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
Aassembly line in a car assembly plant is scheduled to be available for 10.5 hours of production eac...
Questions
question
Mathematics, 13.04.2020 05:00
question
Mathematics, 13.04.2020 05:01
Questions on the website: 13722361