Suppose a contract states that the designer should bear the responsibility if substantial differences were found between the design drawings and the reality. What type of disagreement may happen due to this statement? Select one: a. Disagreement about the definition of concepts and terminology
b. Disagreement about irrelevant facts
c. Disagreement about unknown facts
d. Disagreement about the definition of facts

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
You know the right answer?
Suppose a contract states that the designer should bear the responsibility if substantial difference...
Questions
question
English, 07.07.2019 10:00
question
Chemistry, 07.07.2019 10:00
question
Mathematics, 07.07.2019 10:00
Questions on the website: 13722360