11. A tool used for making hems and seams in the
sheet metal....
![subject](/tpl/images/cats/User.png)
Engineering, 02.09.2021 04:40 sbelgirl2000
11. A tool used for making hems and seams in the
sheet metal.
![ansver](/tpl/images/cats/User.png)
Answers: 1
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Another question on Engineering
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
You know the right answer?
Questions
![question](/tpl/images/cats/en.png)
English, 12.01.2021 16:30
![question](/tpl/images/cats/biologiya.png)
Biology, 12.01.2021 16:30
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.01.2021 16:30
![question](/tpl/images/cats/geografiya.png)
![question](/tpl/images/cats/biologiya.png)
Biology, 12.01.2021 16:30
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/fizika.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.01.2021 16:30
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.01.2021 16:30
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)