subject
Engineering, 05.09.2021 20:10 anrs14

5. A manufacturing company implemented a new production process to reduce defective fuses. From the old process, it was computed that at least 1 defect costs the company an average of
$6,500,000.00 per production run. After implementing the new process, suppose a large lot
contains 10% defective fuses and four fuses are randomly sampled from the lot.

a. Find the probability that at least one fuse in the sample of four is defective.

b. (Continuing from result in item a) in one production run of 500 eighty-unit lots, how
much would be the loss if the cost to manufacture one unit is 335.75?

c. How much is the difference from the old process? Did the new process effectively
reduce the company's losses?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60Β°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
5. A manufacturing company implemented a new production process to reduce defective fuses. From th...
Questions
question
Mathematics, 10.12.2020 03:50
question
Mathematics, 10.12.2020 03:50
question
Mathematics, 10.12.2020 03:50
question
Mathematics, 10.12.2020 03:50
question
Spanish, 10.12.2020 03:50
question
Mathematics, 10.12.2020 03:50
Questions on the website: 13722360