Engineering, 26.09.2021 06:20 JAYDENJONES0111

Bài 1: Một bình chứa khí nén có thể tích 6 m3 nén ở áp suất 8 bar, nhiệt độ 296K.
- Hãy xác định thể tích khí ban đầu khi chưa bị nén là bao nhiêu?
- Nếu làm lạnh khối khí ban đầu khi chưa bị nén ở nhiệt độ 100c thì cần bình chứa có dung tích là bao nhiêu?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
Bài 1: Một bình chứa khí nén có thể tích 6 m3 nén ở áp suất 8 bar, nhiệt độ 296K.
- Hãy xác...
Questions
question
Mathematics, 27.05.2020 16:57
question
Mathematics, 27.05.2020 16:57
question
Social Studies, 27.05.2020 16:57
question
Biology, 27.05.2020 16:57
question
Mathematics, 27.05.2020 16:57
Questions on the website: 13722362