Question # 6 Multiple Choice
The following excerpt is from a report for the Israel Institute of Technology by Ari Teger on high-rise construction.
There are many aspects involved in scheduling a construction project. Even a priori scheduling requires dealing with many interdependent
tasks and resources, and once the project starts the task is even more complex. Although the schedule can be created using calculations
like the one described earlier, construction doesn't actually proceed with such precision. Instead, it's best to either rely on assumptions or
calculations but then with the results adjusted according to experience and common sense. For instance, if a calculation results in a task
taking 0.9 of a workday, it isn't reasonable to assume that another task will be performed that day. There is a good chance that it will take
slightly longer than calculated, and once it's completed, workers will be ready to go home and won't be willing to start a percentage of a
task in the part of the workday that is remaining.
Why would a construction manager not try to increase efficiency by maximizing the amount of tasks on any given workday?
Construction managers shouldn't be involved in maximizing task efficiency; that's the foreman's job.
O Workers are most efficient when they have fewer tasks to handle.
Workers are incapable of truly working a full day.
The schedule he or she creates will not be realistic.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Question # 6 Multiple Choice
The following excerpt is from a report for the Israel Institute...
Questions
Questions on the website: 13722361