subject
Engineering, 03.10.2021 14:00 rosameza2002ov62ci

Question # 5 Multiple Choice
Which of the following best characterizes the relationship between a general contractor and a construction manager?
O A construction manager subcontracts a general contractor to perform work.
O A construction manager works for a general contractor.
O A general contractor is not involved in day-to-day operations; those are managed by a construction manager.
A general contractor is a person; a construction manager is usually a company.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
You know the right answer?
Question # 5 Multiple Choice
Which of the following best characterizes the relationship betw...
Questions
question
Mathematics, 24.08.2019 12:20
question
History, 24.08.2019 12:20
question
Mathematics, 24.08.2019 12:20
Questions on the website: 13722362