subject
Engineering, 06.10.2021 17:00 ks970065

lows m 2 minutes i) A portable machine requires a force of 300N to move it. How much work is machine is moved 20m and what average power is utilized if the movement j) A mass of 2000My is raised through a height of 10m in 20ms. What is (i) the work done MO (ii) the power developed? 10 k) Find the accelerating force when acceleration of Sm/s?. Daving a mass of 1.7Mg increases its spee 2. Use the following Data to answer the Ving questions Iv(v) 2 | (mA) 10. 12 14 I(A) Dio o. ols 6 8 16 0.oll

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
You know the right answer?
lows m 2 minutes i) A portable machine requires a force of 300N to move it. How much work is machine...
Questions
question
Mathematics, 14.07.2019 07:00
question
Mathematics, 14.07.2019 07:00
Questions on the website: 13722363