At a single toll booth, you were able to observe an average vehicle arrival rate of 10 vehicles per minute starting from 7:00 AM. 40 minutes later, average vehicle arrival rate has become 4 vehicles per minute and continues throughout the day at that rate. If the toll booth is able to process each vehicle once every 10 seconds, how many minutes after 7:00 AM will the first queue clear up?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
You know the right answer?
At a single toll booth, you were able to observe an average vehicle arrival rate of 10 vehicles per...
Questions
question
Mathematics, 15.05.2021 08:30
question
History, 15.05.2021 08:30
question
History, 15.05.2021 08:30
question
Mathematics, 15.05.2021 08:30
question
History, 15.05.2021 08:40
Questions on the website: 13722360