subject
Engineering, 16.10.2021 02:50 MahiraBashir

A pumping system is to be designed to pump crude oil a distance of one mile in a 1 foot diameter pipe at a rate of 3500 gpm. The pressures at the entrance and exit of the pipe are atmospheric, and the exit of the pipe is 200 feet higher than the entrance. The pressure loss in the system due to pipe friction is 60 psi. The densityof the oil is 53 lbm/ft3. Find the power, in horsepower, required for the pump.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 03:30
The load on a bolt consists of an axial pull of 10 kn together with a transverse shear force of 5 kn. the bolt material has a yield strength of syt syc 100 mpa. find the diameter of the bolt at factor of safety n-0.5, n 1 and n-2 using maximum shear stress theory
Answers: 3
You know the right answer?
A pumping system is to be designed to pump crude oil a distance of one mile in a 1 foot diameter pip...
Questions
question
English, 15.01.2021 20:20
question
Mathematics, 15.01.2021 20:20
question
Mathematics, 15.01.2021 20:20
question
Health, 15.01.2021 20:20
question
Computers and Technology, 15.01.2021 20:20
Questions on the website: 13722367