Q9 : Assume the Following Process.
Process Burst Time Priority Arrival Time
P1 16 3 0
...
Engineering, 25.10.2021 07:30 savannahvargas512
Q9 : Assume the Following Process.
Process Burst Time Priority Arrival Time
P1 16 3 0
P2 3 1 5
P3 5 5 8
P4 6 4 4
P5 11 2 6
For the set of processes directly above, draw a Gantt chart for the Round Robin
Scheduling Algorithm using. CS=0
a) For the set of processes directly above, draw a Gantt chart for the the Round
Robin Algorithm for a time quantum of q= 5 ms.
b) For the set of processes directly above, calculate the throughput for the
Round Robin Algorithm for a time quantum of 5 ms.
c) For the set of processes directly above, calculate the turnaround time for the
Round Robin Algorithm for a time quantum of 5 ms.
d) For the set of processes directly above, calculate the average turnaround
time for the Round Robin Algorithm for a time quantum of 5 ms.
e) For the set of processes directly above, calculate the waiting time for the
Round Robin Algorithm for a time quantum of 5 ms.
f) For the set of processes directly above, calculate the average waiting
time for the Round Robin Algorithm for a time quantum of 5 ms.
g) What will happen if the time quantum for the Round Robin Algorithm is too
small?
h) What will happen if the time quantum for the Round Robin Algorithm is too
large?
i) What is the CPU Utilization for the system?
Q 10: Repeat Q9 with CS=1
Answers: 2
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
Engineering, 04.07.2019 19:20
Determine (a) the maximum thermal efficiency of reversible power cycles operating between a hot reservoir at 1000°c and a cold reservoir at 200°c and (b) the maximum cops for reversible refrigeration and heat pump cycies, respectively, between 28°c and 14°c.
Answers: 1
History, 06.02.2021 01:00
English, 06.02.2021 01:00
Biology, 06.02.2021 01:00
Physics, 06.02.2021 01:00
Mathematics, 06.02.2021 01:00
English, 06.02.2021 01:00
English, 06.02.2021 01:00
World Languages, 06.02.2021 01:00
Mathematics, 06.02.2021 01:00
Biology, 06.02.2021 01:00