subject
Engineering, 23.11.2021 21:50 kay8739

A factory hires a consultant to recommend ways to improve its productivity. The consultant notices that the production floor is strewn with tools and machines that are not continually in use. Which of the 5S philosophies should the consultant recommend to the management to establish better productivity? OA set in place
OB sort
OC. standardize
OD. shine
O E sustain

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
You know the right answer?
A factory hires a consultant to recommend ways to improve its productivity. The consultant notices t...
Questions
question
Business, 20.09.2020 14:01
question
English, 20.09.2020 14:01
question
Mathematics, 20.09.2020 14:01
Questions on the website: 13722362