subject
Engineering, 06.12.2021 03:20 samarkanduzbek

THE ANTICIPATED LOADS, SUCH AS THE WEIGHT OF THE OCCUPANTS AND MATERIALS AND LOADS IMPOSED BY NATURE SHOULD ALL BE ACCOMMODATED WITH A BUILDING'S

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
question
Engineering, 04.07.2019 19:20
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 05.07.2019 10:10
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
You know the right answer?
THE ANTICIPATED LOADS, SUCH AS THE WEIGHT OF THE OCCUPANTS AND MATERIALS AND LOADS IMPOSED BY NATU...
Questions
question
Mathematics, 27.04.2021 23:00
question
Mathematics, 27.04.2021 23:00
question
English, 27.04.2021 23:00
question
Mathematics, 27.04.2021 23:00
Questions on the website: 13722361