subject
Engineering, 08.12.2021 20:20 keke6361

An airline ticket counter forecasts that 220 people per hour will need to check in. It takes an average of 2 minutes to service a customer. Assume that arrivals are poisson distributed and service times exponentially distributed and that customers wait in a single queue for the first available agent. a) If we want the average time a customer spends in the queue and in service to be 10 minutes or less, how many ticket agents should be on duty?
b) There airline wants to minimize the cost of idle ticket agents and the cost of customers waiting in the queue. The salary of a ticket agent is £12 per hour and the cost of a customer waiting in the queue is £5 per customer per hour. How many ticket agents should be on duty?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
An airline ticket counter forecasts that 220 people per hour will need to check in. It takes an aver...
Questions
question
Geography, 09.11.2019 16:31
question
Social Studies, 09.11.2019 16:31
Questions on the website: 13722367