Engineering, 09.12.2021 14:00 jakedoc31
A six-station automatic assembly line has an ideal cycle time of 12 sec. Downtime occurs for two reasons. First, mechanical and electrical failures cause the line to stop that occur with a frequency of once per 50 cycles. The average downtime for these causes is 3 min. Second, defective components also result in downtime. The fraction defect rate for each of the six components added to the base parts at the six stations is 2%. The probability that a defective component will cause a station jam is 0.5 for all stations. Downtime per occurrence for defective parts is 2 min. Determine
a) Yield of assemblies that are free of defective components? (5 marks)
b) proportion of assemblies that contain at least one defective component? (2 marks)
c) Average production rate of the good products? (10 marks)
d) Uptime efficiency? (3 marks)
Answers: 2
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30Ā°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
A six-station automatic assembly line has an ideal cycle time of 12 sec. Downtime occurs for two rea...
English, 23.12.2019 17:31
Biology, 23.12.2019 17:31
Business, 23.12.2019 17:31
Mathematics, 23.12.2019 17:31
Mathematics, 23.12.2019 17:31
Health, 23.12.2019 17:31
Mathematics, 23.12.2019 17:31
History, 23.12.2019 17:31
History, 23.12.2019 17:31