subject
Geography, 05.10.2019 00:00 mrblake1594

18. estimate the unit profit in mining and processing a 0.80% copper ore deposit if the selling price of copper in concentrate is $1.73/kg and overall unit costs are $6.5/ton. overall recovery is 82%. calculate the cut-off grade of the copper deposit.

ansver
Answers: 1

Another question on Geography

question
Geography, 22.06.2019 01:00
"water seeps into rock cracks and dissolved minerals there.the solution travels through cracks in the. eventually concentrating into large crystals." which process is that
Answers: 1
question
Geography, 22.06.2019 21:40
Find the equation of the line passing through the point (–1, 5) and perpendicular to the line 3x + y = 4.
Answers: 3
question
Geography, 23.06.2019 02:00
The ratio of the measures of the three angles in a triangle is 14: 15: 11 find the measures of the angles
Answers: 2
question
Geography, 23.06.2019 04:00
Can someone me with this plz? ! i'm putting 20 points on it!
Answers: 1
You know the right answer?
18. estimate the unit profit in mining and processing a 0.80% copper ore deposit if the selling pric...
Questions
question
Mathematics, 28.11.2021 01:00
question
Mathematics, 28.11.2021 01:00
question
Mathematics, 28.11.2021 01:00
question
Mathematics, 28.11.2021 01:00
question
Mathematics, 28.11.2021 01:10
question
English, 28.11.2021 01:10
question
History, 28.11.2021 01:10
Questions on the website: 13722361