subject
Mathematics, 16.07.2019 04:30 kenzierosa

Marcus and tony work for lombardo's pipe and concrete. mr. lombardo is preparing an estimate for a customer. he knows that marcus lays a slab of concrete in 6 hours. tony lays the same size slab in 4 hours. if both work on the job and the cost of labor is $ 43.00 per hour, decide what the labor estimate should be.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
One integer is 8 times another. if the product is 72, then find the integers
Answers: 2
question
Mathematics, 21.06.2019 18:00
Calculate the density of benzene if 300ml of it weighs 263g. a. 0.88 g/ml b. 1.14 g/ml c. 78,900 g/ml d. 37 g/ml
Answers: 2
question
Mathematics, 21.06.2019 19:30
Factor the polynomial 4x4 – 20x2 – 3x2 + 15 by grouping. what is the resulting expression? (4x2 + 3)(x2 – 5) (4x2 – 3)(x2 – 5) (4x2 – 5)(x2 + 3) (4x2 + 5)(x2 – 3)
Answers: 1
question
Mathematics, 21.06.2019 21:30
Acyclist bike x distance at 10 miles per hour .and returns over the same path at 8 miles per hour.what is the cyclist average rate for the round trip in miles per hour ?
Answers: 1
You know the right answer?
Marcus and tony work for lombardo's pipe and concrete. mr. lombardo is preparing an estimate for a c...
Questions
question
Mathematics, 22.10.2020 18:01
Questions on the website: 13722367