subject
Mathematics, 07.07.2019 16:00 smartperraorwhateva

Aplumbing contractor bid the rough-in work for a new three-story office building based an estimate of 850 hours of a journey-level plumber's time on the job. after the job was in progress, the contractor determined that the first floor required 342 hours and the second floor required 329 hours. how many labor hours are left in the estimate to complete the third floor?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:40
The weights of broilers (commercially raised chickens) are approximately normally distributed with mean 1387 grams and standard deviation 161 grams. what is the probability that a randomly selected broiler weighs more than 1,425 grams?
Answers: 2
question
Mathematics, 21.06.2019 23:30
The average daily maximum temperature for laura’s hometown can be modeled by the function f(x)=4.5sin(πx/6)+11.8 , where f(x) is the temperature in °c and x is the month. x = 0 corresponds to january.what is the average daily maximum temperature in may? round to the nearest tenth of a degree if needed.use 3.14 for π .
Answers: 1
question
Mathematics, 22.06.2019 03:50
The sum of the abscissa and the ordinate is six
Answers: 2
question
Mathematics, 22.06.2019 04:30
The coordinates of one point of a line segment ate (-2,-7). the line segment is 12 units long. give three possible coordinates of the line segment’s other end point.
Answers: 1
You know the right answer?
Aplumbing contractor bid the rough-in work for a new three-story office building based an estimate o...
Questions
question
Mathematics, 05.05.2020 05:15
question
Mathematics, 05.05.2020 05:15
question
Mathematics, 05.05.2020 05:15
Questions on the website: 13722360