subject
Mathematics, 27.06.2019 06:00 JeroMii

Ll the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours. a how many hours would this job take if the number of workers decreased by factor of 2?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
When a formula is solved for a particular variable, several different equivalent forms may be possible. if we solved a=1/2bh for h, one possible correct answer is h=2a/b . which one of the following is not equivalent to this? a. h= 2(a/b) b. h= 2a(1/b) c. h= a/1/2b d. h= 1/2a/b
Answers: 1
question
Mathematics, 21.06.2019 15:00
Which expression is equivalent to 5r674 pression is equivalent to see lo 5r614) 4r322,4 ) 5 ( 2 5t5 |
Answers: 3
question
Mathematics, 21.06.2019 16:40
The table shows the total distance that myra runs over different time periods. which describes myra’s distance as time increases? increasing decreasing zero constant
Answers: 1
question
Mathematics, 21.06.2019 19:30
Find the actual dimensions of the box. the side length are in meters and integers. the surface area of the box is 104 m2 and volume of the box is 60 m3.
Answers: 1
You know the right answer?
Ll the members of a construction crew work at the same pace. six of them working together are able t...