Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 16:30
In two or more complete sentences, determine the appropriate model for the given data and explain how you made your decision. (1,-1), (2,0.5), (5,1.5), (8,2)
Answers: 2
Mathematics, 21.06.2019 19:30
1. are the corresponding angles congruent 2. find the ratios of the corresponding sides 3. is triangle jkl congruent to triangle rst? if so what is the scale factor
Answers: 1
Mathematics, 21.06.2019 20:00
The two cylinders are similar. if the ratio of their surface areas is 9/1.44 find the volume of each cylinder. round your answer to the nearest hundredth. a. small cylinder: 152.00 m3 large cylinder: 950.02 m3 b. small cylinder: 972.14 m3 large cylinder: 12,924.24 m3 c. small cylinder: 851.22 m3 large cylinder: 13,300.25 m3 d. small cylinder: 682.95 m3 large cylinder: 13,539.68 m3
Answers: 2
Using pert, adam munson was able to determine that the expected project completion time for the cons...
Chemistry, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Computers and Technology, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Computers and Technology, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Biology, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20
Mathematics, 12.02.2021 15:20