subject
Mathematics, 09.11.2019 04:31 xXwolfieplayzXx

Acarpenter contracts to do a job. the costs for the job are $2000 for materials, $500 for labor, and $150 for equipment rental. what would be the total cost of materials were increased by 15%

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Assume that there is a 11% rate of disk drive failure in a year. a. if all your computer data is stored on a hard disk drive with a copy stored on a second hard disk drive, what is the probability that during a year, you can avoid catastrophe with at least one working drive? b. if copies of all your computer data are stored on four independent hard disk drives, what is the probability that during a year, you can avoid catastrophe with at least one working drive?
Answers: 2
question
Mathematics, 22.06.2019 00:50
E. which of the following is not a possible probability? a. 25/100 b. 1.25 c. 1 d. 0
Answers: 1
question
Mathematics, 22.06.2019 02:20
Find the measure of angle a in the following triangle
Answers: 1
question
Mathematics, 22.06.2019 03:30
Which lines are parallel? justify your answer. lines p and q are parallel because same side interior angles are congruent. lines p and q are parallel because alternate exterior angles are congruent lines l and m are parallel because same side interior angles are supplementary lines l and m are parallel because alternate interior angles are supplementary.
Answers: 2
You know the right answer?
Acarpenter contracts to do a job. the costs for the job are $2000 for materials, $500 for labor, and...
Questions
Questions on the website: 13722359