subject
Mathematics, 24.06.2019 22:50 carvarceuanmoss

Lockheed martin, the defense contractor designs and build communication satellite systems to be used by the u. s. military. because of the very high cost the company performs numerous test on every component. these test tend to extend the component assembly time. suppose the time required to construct and test (called build time) a particular component is thought to be normally distributed, with a mean equal to 45 hours and a standard deviation equal to 6.75 hours. to keep the assembly flow moving on schedule, this component needs to have a build time between 37.5 and 54 hours. find the propability that the bulid time will be such that assembly will stay on schedule.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Ineed i don’t get this at all! and you
Answers: 1
question
Mathematics, 21.06.2019 13:00
Last year amusement park received 236,758 visitors it was open every day of the year but 7 holliday’s what was the average number of visitors to the park per day
Answers: 1
question
Mathematics, 21.06.2019 16:00
To make a monster appear large in a movie, a human actor wore a costume and walked through a scale model of a city. the scale used was 1 inch = 15 feet. the actor is 60 inches tall. how tall does the monster appear in the movie? question 5 options: 720 feet 75 feet 4 feet 900 feet
Answers: 2
question
Mathematics, 21.06.2019 16:00
Find the average speed of a rabbit that runs a distance of 22 m in a time of 1.8 s .
Answers: 1
You know the right answer?
Lockheed martin, the defense contractor designs and build communication satellite systems to be used...
Questions
Questions on the website: 13722359