subject
Mathematics, 25.06.2019 06:40 batmanmarie2004

Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Write an inequality for this description. - one fourth of the opposite of the difference of five and a number is less than twenty.
Answers: 1
question
Mathematics, 22.06.2019 00:00
Which expression is a perfect cube? a. x8 b. y24 c. m28 d. x64
Answers: 3
question
Mathematics, 22.06.2019 02:00
Which of the following is not a solution to the inequality graphed below? (-2, -4)(-1, -5)(0, -3)(2, -1)which of the following is a solution to the inequality graphed below? select all that apply.(-3, -3)(-1, -1)(-3, -1)(2, 2)
Answers: 1
question
Mathematics, 22.06.2019 03:50
Write the equation for the graph with the vertex (-6,2) and focus (-7.25,2) a. (y-2)^2 = -5(x+6) b. (y+6)^2 = -5(x-2) c. (x+6)^2 = -5(y+2) d. (y-6)^2 = 5(x+6)
Answers: 1
You know the right answer?
Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line w...
Questions
Questions on the website: 13722361