In a learning curve application, 658.5 work hours are required for the third production unit and 615.7 work hours are required for the fourth production unit. determine the value of n (and therefore s) in the equation z u=k(u^n ), where u=the output unit number; z_=the number of input resource units to produce output unit u; k=the number of input resource units to produce the first output unit; s=the learning curve slope parameter expressed as a decimal (s=0.9 for a 90% learning curve); n=log⁡s/log⁡2 =the learning curve exponent.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
Definition: es. this is a disadvantage or weak point that makes someone or something less effective.
Answers: 2
question
Mathematics, 21.06.2019 18:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
question
Mathematics, 21.06.2019 19:00
What term makes it inconsistent y=2x - 4
Answers: 1
question
Mathematics, 21.06.2019 19:30
Solve the following inequalities and show the solution on a number line. 2x+3< 3(4x+5)
Answers: 1
You know the right answer?
In a learning curve application, 658.5 work hours are required for the third production unit and 615...
Questions
question
Mathematics, 12.10.2019 03:20
question
Physics, 12.10.2019 03:20
Questions on the website: 13722362