Using the following project information, calculate the expected time for each of the project activities. activity optimistic time estimate(weeks) most likely time estimates (weeks) pessimistic time estimates (weeks) immediate predecessor(s) a 3 7 11 none b 4 4 7 a c 4 8 14 a d 3 7 12 b e 5 9 17 c f 3 4 6 d, e g 4 6 10 d, e h 5 5 12 f i 4 9 11 g j 3 3 3 h, i

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Find the solution of system of equation y= x-4 y=4x+2
Answers: 3
question
Mathematics, 21.06.2019 15:50
Name the most appropriate metric unit for each measurement
Answers: 3
question
Mathematics, 21.06.2019 21:30
Rhombus adef is inscribed into a triangle abc so that they share angle a and the vertex e lies on the side bc . what is the length of the side of the rhombus if ab=c, and ac=b.
Answers: 1
question
Mathematics, 21.06.2019 22:30
Sketch the vector field vector f( vector r ) = 8vector r in the xy-plane. select all that apply. the length of each vector is 8. the lengths of the vectors decrease as you move away from the origin. all the vectors point away from the origin. all the vectors point in the same direction. all the vectors point towards the origin. the lengths of the vectors increase as you move away from the origin.
Answers: 2
You know the right answer?
Using the following project information, calculate the expected time for each of the project activit...
Questions
question
Mathematics, 22.10.2020 08:01
question
Mathematics, 22.10.2020 08:01
question
Biology, 22.10.2020 08:01
question
Mathematics, 22.10.2020 08:01
question
English, 22.10.2020 08:01
Questions on the website: 13722367