subject
Mathematics, 29.07.2019 20:20 widnickab

Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois, factory are as follows: activity | time (in hours) | immediate predecessors a | 6.0 | -- b | 7.2 | -- c | 5.0 | a d | 6.0 | b, c e | 5.0 | b, c f | 7.7 | d g | 4.0 | e, f (a) draw the project network using aon. (b) identify the critical path. (c) what is the expected project length? (d) draw a gantt chart for the project.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Svetlana's hair is 4 4 centimeters ( cm cm) long. her hair grows 1 . 5 cm 1.5cm per month. svetlana wants her hair to be less than 1 6 cm 16cm long. write an inequality to determine the number of months, m m, svetlana can allow her hair to grow so that it is less than 1 6 cm 16cm long.
Answers: 3
question
Mathematics, 21.06.2019 21:00
Louis wants to carpet the rectangular floor of his basement the basement has an area of 864 square feet the width of the basement is 2/3 its length what is the length of lewis's basement
Answers: 2
question
Mathematics, 21.06.2019 22:00
In dire need~! describe how to use area models to find the quotient 2/3 divided by 1/5. check your work by also finding the quotient 2/3 divided by 1/5 using numerical operations only.
Answers: 1
question
Mathematics, 21.06.2019 23:00
The value of cos 30° is the same as which of the following?
Answers: 1
You know the right answer?
Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois,...
Questions
question
Mathematics, 02.04.2021 22:40
question
Mathematics, 02.04.2021 22:40
question
Mathematics, 02.04.2021 22:40
Questions on the website: 13722361