Using the information in table 12-7, construct a pert network and each of the following questions: a. what is the expected project completion data? b. what is the scheduled start and completion date for each activity? c. which activities are on the critical path? d. how long can noncritical path activities be delayed without jeopardizing the overall completion date for this proiect?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which product is positive a is 2/5 -8/9 -1/3 -2/7 b is -2/5 8/9 -1/3 -2/7 c is 2/5 8/9 1/3 -2/7 d is -2/5 -8/9 1/3 2/7
Answers: 2
question
Mathematics, 22.06.2019 00:20
Convert the number to decimal form. 12) 312five a) 82 b) 30 c) 410 d) 1560 13) 156eight a) 880 b) 96 c) 164 d) 110 14) 6715eight a) 53,720 b) 3533 c) 117 d) 152
Answers: 1
question
Mathematics, 22.06.2019 00:30
The power generated by an electrical circuit (in watts) as a function of its current c (in amperes) is modeled by p(c)= -15c(c-8) what current will produce the maximum power?
Answers: 1
question
Mathematics, 22.06.2019 05:30
The 7th grade has collected $200 for a field trip that would cost $600. the teachers decided to ask $50 from additional students to cover the cost. how mny students must pay to cover the cost ? a 16studentsb 80studentsc 160studentsd 8students show work
Answers: 2
You know the right answer?
Using the information in table 12-7, construct a pert network and each of the following questions:...