subject
Mathematics, 17.09.2019 21:30 waterdrop026

Acompany manufactures an assembly consisting of a frame, a shaft, and a ball bearing. the company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. each shaft must be processed on a forging machine, a lathe, and a grinder. these operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder the company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 illers. assume that each machine operates a maximum of 2400 hours per year. formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Which equation requires the division property of equality to be solved?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Collin did the work to see if 10 is a solution to the equation r/4=2.4
Answers: 1
question
Mathematics, 22.06.2019 00:00
Yvaries directly as x. y =90 when x=6. find y when x=13
Answers: 1
question
Mathematics, 22.06.2019 01:00
Given right triangle a w/a hypotenuse length of x+4 and a leg of x, and right triangle b, w/ a hypotense length of 3y and a leg length of y+4 for what values of x and y are the triangles congruent by hl?
Answers: 3
You know the right answer?
Acompany manufactures an assembly consisting of a frame, a shaft, and a ball bearing. the company ma...
Questions
question
Mathematics, 22.07.2021 14:00
question
Mathematics, 22.07.2021 14:00
question
Mathematics, 22.07.2021 14:00
Questions on the website: 13722361