Aconstruction company can remove 3/5 tons of dirt from a construction site each hour. how long will it take them to remove 30 tons of dirt from the site?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
The polygon tool to draw a rectangle with a length of 5 units and a height of 3 units. one of the sides of the rectangle falls on line ab , and the rectangle has a vertex of a. each segment on the grid represents 1 unit.
Answers: 1
question
Mathematics, 21.06.2019 20:50
You need to solve a system of equations. you decide to use the elimination method. which of these is not allowed? 3x - 2y = 7 3x + 4y = 17 equation 1 equation 2
Answers: 1
question
Mathematics, 21.06.2019 22:00
Aschool had an election where the candidates received votes in the ratio 1: 2: 3. if the winning candidate received 210 votes, how many total people voted in the election?
Answers: 1
question
Mathematics, 22.06.2019 02:00
Which expression is equivalent to (5x^7+7x^8) − (4x^4−2x^8)? a. 9x^8 + 5x^7−4x^4 b. 3x^8 + 7x^7 c. 12x^8 − 2x^4 d. 5x^8 + 5x^7 + 4x^4
Answers: 1
You know the right answer?
Aconstruction company can remove 3/5 tons of dirt from a construction site each hour. how long will...
Questions
question
History, 10.02.2021 17:20
question
Mathematics, 10.02.2021 17:20
question
History, 10.02.2021 17:20
question
Mathematics, 10.02.2021 17:20
question
Mathematics, 10.02.2021 17:20
question
Mathematics, 10.02.2021 17:20
Questions on the website: 13722360