subject
Mathematics, 20.09.2019 02:10 Ksedro1998

The dulac box plant produces 500 cypress packing boxes in two-10 hour shifts. due to higher demand, dulac has decided to operate three eight-hour shifts instead. dulac is now able to produce 600 boxes per day. what has happened to production:
a. it has increased by 50 sets/shift
b. it has increased by 20 percent
c. it has increased by 37.5 sets/hr
d. it has decreased by 8.3 percent
e. it has decreased by 9.1 percent.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Aline parallel to a triangle's side splits ab into lengths of x - 5 and x + 2. the other side, ac, is split into lengths of x and x + 12. what is the length of ac? a) 12 b) 24 c) 36 d)
Answers: 1
question
Mathematics, 21.06.2019 19:00
Find the length of the diagonal of the rectangle. round your answer to the nearest tenth. || | | 8 m | | | | 11 m
Answers: 2
question
Mathematics, 21.06.2019 19:20
Based on the diagram, match the trigonometric ratios with the corresponding ratios of the sides of the triangle. tiles : cosb sinb tanb sincposs matches: c/b b/a b/c c/a
Answers: 2
question
Mathematics, 21.06.2019 21:00
Awater tank holds 18000 gallons. how long will it take for the water level to reach 6000 gallons if the water is used at anaverage rate of 450 gallons per day
Answers: 1
You know the right answer?
The dulac box plant produces 500 cypress packing boxes in two-10 hour shifts. due to higher demand,...
Questions
question
Mathematics, 22.12.2020 15:50
question
World Languages, 22.12.2020 16:00
question
Mathematics, 22.12.2020 16:00
question
Mathematics, 22.12.2020 16:00
question
English, 22.12.2020 16:00
question
Mathematics, 22.12.2020 16:00
question
English, 22.12.2020 16:00
Questions on the website: 13722362