subject
Mathematics, 20.09.2019 18:20 mia6291

One batch of 25 units requires the following processing times per unit: move time for raw materials to cutting department, 6 minutes; cutting department, 4 minutes; move time to sewing department, 3 minutes; sewing department, 10 minutes; move time to packaging department, 2 minutes; and packaging department, 4 minutes. a. how much of the time spent to produce the units is value-added time? b. determine the total within-batch wait time. c. calculate the total lead time for the batch.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Find the value of x for which abcd must be a parallelogram -9-6x x-30
Answers: 2
question
Mathematics, 21.06.2019 18:30
Kayla wants to find the width, ab, of a river. she walks along the edge of the river 65 ft and marks point c. then she walks 25 ft further and marks point d. she turns 90° and walks until her location, point a, and point c are collinear. she marks point e at this location, as shown. (a) can kayla conclude that δ and δ are similar? why or why not? (b) suppose de = 15 ft. what can kayla conclude about the width of the river?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Are the corresponding angles congruent? explain why or why not.
Answers: 2
question
Mathematics, 22.06.2019 02:00
Emily convinced her mom to buy a giant box of her favorite cereal. her mom doesn't think the box will fit on their shelf. the volume of the box is 1000 cm^3 . the base of the box is 25 cm by 10 cm
Answers: 1
You know the right answer?
One batch of 25 units requires the following processing times per unit: move time for raw materials...
Questions
question
Physics, 19.02.2021 01:00
question
Biology, 19.02.2021 01:00
Questions on the website: 13722363