Mathematics, 08.10.2019 01:10 aidanw
Acompany used to produce 300 units every day, but 20% of the units were defective. after installing a new process, the defect rate has been reduced to 5%, while output has remained the same. what is the percent increase in productivity due to installing the new process?
Answers: 1
Mathematics, 21.06.2019 14:00
Which of the following is the missing term, a2, of the geometric sequence in which a1=2 and a3=200
Answers: 2
Mathematics, 21.06.2019 19:40
What is the slope of the line that contains the points (-2,1) and (0,-3)
Answers: 2
Mathematics, 22.06.2019 00:30
Anew test for ra is being developed. the test is administered to 750 patients with ra and 750 without ra. for the sake of the question, assume the prevalence of ra in this population is 50%. of the 750 patients with ra, 575 have a positive result. of the 750 patients without ra, 150 have a positive result. what is the positive predictive value of the new test? a575/(575+150) b. 600/(600+ 150) c. 575/(575+125) d. 600/(600+ 125)
Answers: 2
Mathematics, 22.06.2019 00:30
What is the geometric mean of 3 and 7? a) square root of 21 b) 2 square root of 6 c) 2 square root of 7 d) 21
Answers: 2
Acompany used to produce 300 units every day, but 20% of the units were defective. after installing...
English, 09.12.2020 23:20
Mathematics, 09.12.2020 23:20
Mathematics, 09.12.2020 23:20
Physics, 09.12.2020 23:20
Mathematics, 09.12.2020 23:20
History, 09.12.2020 23:20
Biology, 09.12.2020 23:20