subject
Mathematics, 08.10.2019 01:10 aidanw

Acompany used to produce 300 units every day, but 20% of the units were defective. after installing a new process, the defect rate has been reduced to 5%, while output has remained the same. what is the percent increase in productivity due to installing the new process?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which of the following is the missing term, a2, of the geometric sequence in which a1=2 and a3=200
Answers: 2
question
Mathematics, 21.06.2019 19:40
What is the slope of the line that contains the points (-2,1) and (0,-3)
Answers: 2
question
Mathematics, 22.06.2019 00:30
Anew test for ra is being developed. the test is administered to 750 patients with ra and 750 without ra. for the sake of the question, assume the prevalence of ra in this population is 50%. of the 750 patients with ra, 575 have a positive result. of the 750 patients without ra, 150 have a positive result. what is the positive predictive value of the new test? a575/(575+150) b. 600/(600+ 150) c. 575/(575+125) d. 600/(600+ 125)
Answers: 2
question
Mathematics, 22.06.2019 00:30
What is the geometric mean of 3 and 7? a) square root of 21 b) 2 square root of 6 c) 2 square root of 7 d) 21
Answers: 2
You know the right answer?
Acompany used to produce 300 units every day, but 20% of the units were defective. after installing...
Questions
question
Mathematics, 09.12.2020 23:20
question
Mathematics, 09.12.2020 23:20
question
Mathematics, 09.12.2020 23:20
Questions on the website: 13722360